A measurement that is not attached to an identity is an observation, not a record. The gap between a working measuring cell and a usable SPC system is almost never the measurement — it is the field list, the identity convention and the gauge study that has to happen before any capability number means anything.
Every record needs five things: which part, which feature, which value, which limit, and which moment. Software choice is downstream of agreeing that list. Most failed SPC rollouts we see had the measuring system working for months while the field list was still being negotiated between quality and production.
A workable minimum per feature: feature name as it appears on the drawing, nominal, upper and lower limit, measured value with its unit, pass/fail state, and the measurement recipe version. Without the recipe version, a change in lighting or edge threshold silently invalidates historical comparison.
A CPK computed from an unqualified measurement is a number, not a capability. The study that has to come first is repeatability and reproducibility on the actual fixture: the same part loaded repeatedly, by more than one operator if the cell is manual, with the spread recorded per gating feature.
The comparison that matters is the study spread against the tolerance band, not against the specification-sheet repeatability. The sheet figure is measured under controlled conditions; your fixture, your part surface and your operator are the conditions that decide the working number. A measurement system whose spread consumes a large share of the tolerance will produce a CPK that says more about the instrument than about the process.
Model range, as stated in the IMAGE 3 series specification sheet. Repeatability here is the figure printed in the sheet; it is not a guarantee for your own part, your fixture or your operator. Treat it as the floor you start from when you run a trial, not as the number you can quote to a customer on day one.
| Model | Precision-mode range (X×Y×Z) | Wide-field range (X×Y×Z) | Lens field of view (precision / wide-field) | Repeatability (precision / wide-field) | Camera | Height measurement |
|---|---|---|---|---|---|---|
| IMAGE 3 | 18 × 18 mm (fixed platform) | Ø100 mm | 18 × 18 mm / Ø100 mm | ±0.5 µm / ±1 µm | Two 1" 20 MP B/W | Not available |
| IMAGE 3 PLUS | 118 × 118 × 75 mm | 200 × 200 × 75 mm | 18 × 18 mm / Ø100 mm | ±0.5 µm / ±1 µm | Two 1" 20 MP B/W | Not available |
| IMAGE 3 PRO | 218 × 118 × 75 mm | 300 × 200 × 75 mm | 18 × 18 mm / Ø100 mm | ±0.5 µm / ±1 µm | Two 1" 20 MP B/W | Not available |
| IMAGE 3 PRO-H | 218 × 118 × 75 mm | 300 × 200 × 75 mm | 18 × 18 mm / Ø100 mm | ±0.5 µm / ±1 µm | Two 1" 20 MP B/W | Not available |
| IMAGE 3 MAX | 205 × 104 × 75 mm | 223 × 118 × 75 mm | 6.4 × 4.8 mm / 18.8 × 14.1 mm | ±0.25 µm / ±0.5 µm | 1" 20 MP B/W | 8055 spectral confocal, WD 55 mm, range ±3 mm |
| IMAGE 3 MAX2 | 206 × 106 × 75 mm | 225 × 125 × 75 mm | 6 × 6 mm / 25 × 25 mm | ±0.25 µm / ±0.5 µm | 1" 20 MP B/W | 8055 spectral confocal (optional) |
The full specification sheet, including the camera and lighting options and the workpiece-to-model mapping, sits on the IMAGE 3 series product page. If you only want a first-pass sanity check on whether your part fits any model, the instant measurement selection tool takes the part envelope and returns the models that can cover it.
Three conventions decide whether a record survives an audit. First, part identity: a serial, a lot plus cavity, or a timestamp plus position — whichever the customer can actually map back. Second, time source: one clock for the cell, not the operator workstation and the measuring PC independently. Third, immutability: a record that can be edited after the fact is not a record.
The practical test is to pick a part from three months ago and reconstruct its measurement. If that takes more than a few minutes, the convention is not working, regardless of what the software brochure says.
Useful: a run chart per gating feature with limits drawn, a capability summary with the study spread stated alongside, an exception list of out-of-limit parts with their identity, and a change log of recipe versions. Not useful: a single CPK number with no study behind it, a report that mixes features judged by different instruments, and any chart whose sample size is not stated.
The sample-size point deserves emphasis. A capability index computed from a handful of parts is dominated by sampling noise, and the honest presentation is to state the sample size next to the number every time.
Agree the field list. Then run the gauge study on the fixture. Then fix the identity and time conventions. Then connect the export. Then compute the first capability number. Reversing the last two steps — connecting first and studying later — is the most common way a project spends a year producing charts that nobody trusts.
Per feature: drawing name, nominal, upper and lower limit, measured value with unit, pass/fail state, and the recipe version. Per record: part identity, lot or cavity, timestamp from a single cell clock, and operator if the cell is manual.
Only after a gauge study on the actual fixture. The specification-sheet repeatability is a controlled-condition figure; the working spread depends on the fixture, the part surface and the operator. A capability index computed without that study describes the instrument rather than the process.
Enough that sampling noise does not dominate the result, and the number used has to be stated next to the index every time. A capability figure presented without its sample size is not interpretable, which is why the report should carry both.
With a convention the customer can map back: a serial, lot plus cavity, or timestamp plus tray position. The test is whether a part from three months ago can be reconstructed in a few minutes. Identity written on a bag rather than carried in the record fails that test.
Because the measurement recipe changed while the historical data was kept in the same series. Recording a recipe version per record makes that visible; without it, a trend chart can silently combine two different measurements.
No. Removing them hides the events the chart exists to show. The report should carry an exception list with the identity of each out-of-limit part, alongside the run chart that includes them.
The fastest way to close this question is a real part, not a discussion. Send one sample with the drawing and the features you actually gate, and we will run it and report what the measurement returns — including the features that come back as a no. A short written feasibility note is more useful than a brochure.